This line facility is a forming line designed to produce 2W and 3W guard rails by exchanging cassettes and molds without changing rolls.
MATERIAL | CR,HGI,HR |
---|---|
THICKNESS OF COIL | 3.0~5.0MM |
LINE SPEED | 5~15M/MIN |
FORMING STAND | 5~15 STAGE |
ELECTRIC POWER | 75KW |